Assess & quote
Site visit, plan review and Dial Before You Dig. One clear quote covering dig, cartage and cleanup.
North Strathfield is a brick-and-Federation suburb on shale, basement, pool and knock-down work on solid lots. The regular jobs here are basement digs, underpinning and pool digs. Services located first, sites left level and clean.
Get a free quoteNo obligation, free site quote.
Got it, thanks. We'll be in touch to arrange your site assessment and clear quote.
From a knock-down rebuild to a new estate pad, each service has its own page with the detail.
North Strathfield sits about 12 kilometres west of the city. The markers are North Strathfield station, Concord Oval nearby and Powells Creek. It's ringed by Concord, Concord West, Strathfield and Homebush. What's changing: basement digs and underpinning under terraces, and granny flats and rear pools on the small lots.
North Strathfield's housing near North Strathfield station runs to victorian and Federation terraces and semis, with heritage conservation areas throughout. Near North Strathfield station, the heritage streets carry conditions near the listed houses. Day to day around Concord that's basement digs, underpinning and pool digs.
North Strathfield sits on Wianamatta shale over reactive clay, out toward North Strathfield station. On the flat North Strathfield blocks around Concord Oval nearby, the fall has to be cut into the pad and the trench because the ground gives none of its own. Around Concord West, reactive clay, so the fill is layered and compacted.
In City of Canada Bay, North Strathfield around North Strathfield station sits under heritage and tree protection controls, so the dig follows the approved plans. Access to North Strathfield is off Concord Road or George Street; access is tight through the older inner streets, near Concord.
Every job follows the same sequence, whether it's a single trench or a full site cut.
A trench can be a day, a basement can be weeks. Dates come with the quote, not after.
North Strathfield and the streets around it, from the older estates to the new blocks.
From the older streets to the newer blocks, North Strathfield and the suburbs around it. If you're anywhere in the North Strathfield area, we can get to you.
See the whole Inner West →It depends on the volume of material, the ground (wianamatta shale over reactive clay), access for the machine and how far spoil has to be carted. Every job gets a written quote after a site look, with the dig, cartage and cleanup spelled out, so you know what’s included before anything starts.
Usually, if the excavation is part of a build. Cut and fill beyond set limits, work near boundaries and anything on a lot with a flood, bushfire or heritage overlay needs approval as part of the DA or CDC. We work to the approved plans; check with your certifier before the dig is booked.
A trench, pool dig or single pad is a day or two; a knock-down site cut or a basement runs longer and depends on volume, ground and weather. Dates come with the quote, not after.
Not usually in the first metre on the flat streets. Wianamatta shale over reactive clay. Shale under clay is ripped rather than broken, and old fill is the more common surprise than rock.
Yes, and it’s one of the most common Inner West jobs. The house is supported to the engineer’s underpinning design, the ground under it is dug in stages through the front or rear, and rock is sawn at the party walls so the neighbours’ footings stay put. Spoil goes out by conveyor.
Through the house on boards with the floor protected, or over the back fence by crane. Spoil comes out the same way or by conveyor into a skip in the lane. Slower than a side gate and priced for it, but it’s how most Inner West yards get dug.
Conditions on the approval, usually about keeping the front of the house, protecting the neighbours’ walls, and sometimes an archaeologist watching the dig on the oldest streets. Haberfield and the older parts of Balmain, Glebe and Marrickville are the strictest. We dig to what’s approved.
Reactive clay. It swells in wet winters and shrinks in dry summers, and anything poured on loose or uncompacted fill moves with it. A pad cut and filled in compacted layers to the engineer’s spec is what stops the new slab doing the same thing.
Tell us about the job. We'll look at the site before quoting, so you know what's included before anything starts.
Request received. We'll be in touch to arrange your site assessment and clear quote.