Knock-down, clear and dig as one job. Houses, sheds, garages, slabs and old pools taken down, rubble carted or recycled, the site stripped, then excavated to plan for the new build. One crew, one sequence, no gap between the old coming down and the new going in.
Get a free quoteNo obligation, free site quote.
Got it, thanks. We'll be in touch to arrange your site assessment and clear quote.
From a single fibro cottage to a double-storey brick house on a duplex block.
Every job follows the same sequence, whether it's a single trench or a full site cut.
A trench can be a day, a basement can be weeks. Dates come with the quote, not after.
Excavators are sized in tonnes, and the size decides both what it can dig and whether it fits your block. We bring the one that suits the job, not whatever's parked up.
A knock-down rebuild runs in a fixed order, and most of the delays happen when the order is broken. Before anything is touched, the demolition approval is in place as part of the DA or CDC, the services are disconnected and capped by the relevant utilities, and an asbestos survey has been done. Anything the survey finds is removed by a licensed asbestos removalist and cleared with a certificate before the demolition crew starts, because disturbing it during demolition is both dangerous and illegal.
With the site clear of asbestos, the soft strip comes first: fittings, windows, doors, roofing and anything that can be salvaged or recycled separately. Then the structure comes down, usually with an excavator fitted with a grab, working from the roof down and from the back of the block towards the street so the machine always has room to work and the rubble lands where it can be loaded. Neighbours are notified, dust is controlled with water, and the boundaries are protected with mesh fencing.
The part that separates demolition and excavation done as one job from done as two is what happens under the house. Old slabs, strip footings, brick piers and redundant drainage are dug out and carted, not left in the ground where the new footings will find them. Buried rubble and old fill is stripped. The rubble from the house is sorted as it's loaded: concrete and brick to a recycler, steel to scrap, timber and general waste to the appropriate facility.
Once the site is stripped to clean ground, the new build's earthworks start straight away with the same machines: the pad cut to the builder's levels, the footings trenched, the services run. Dial Before You Dig covers the new work, and the set-out for the new house is done on a site that's actually clean.
Handover is a level, tidy pad ready for the surveyor and the concreter, with everything from the old house gone.
It depends on the size and construction of the house, whether there’s asbestos, how much rubble has to go and what the new build’s excavation involves. Quoting both together is usually cheaper than separately because the machines are already on site. Every job gets a written quote after a site look with demolition, asbestos, cartage and the new cut spelled out.
Yes. Demolition is approved as part of your DA or CDC, and there may be conditions on hours, dust, tree protection and waste. We work to the approved documents and your certifier’s conditions.
Any house built before about 1990 is likely to have some. It’s identified in a survey at the start and removed by a licensed asbestos removalist with a clearance certificate before demolition begins. It’s never disturbed during demolition.
Sorted as it’s loaded. Concrete and brick go to a recycler and often come back as road base, steel goes to scrap, timber and general waste to licensed facilities. Disposal is set out in the quote.
Yes. Slabs, strip footings, piers and old drainage are dug out and carted, not buried. Leaving them in is how new footings end up sitting on old concrete.
Yes. Concrete pools are broken out or collapsed and backfilled to the engineer’s specification; fibreglass shells are cut up and removed. If the new build goes over the old pool, the backfill is compacted and certified.
It depends on the house, asbestos, rubble volume and the new cut, but doing it as one job removes the gap between contractors. A program comes with the quote.
From Liverpool and Macarthur out west, up through the Hills and the North Shore, across the Inner West and the Eastern Suburbs, over to the Northern Beaches and down to the Sutherland Shire. If you're anywhere in Sydney, we can get to you.
Check we cover your suburb →Tell us about the job. We'll look at the site before quoting, so you know what's included before anything starts.
Request received. We'll be in touch to arrange your site assessment and clear quote.