Licensed Sydney Trenching

Trenching & Drainage Sydney

Service trenches, stormwater lines, subsoil and ag drains dug to line and level across Sydney. Bedded, backfilled and compacted so the plumber can lay straight in and nothing sinks afterwards. Tight access and rock handled.

Get a free quote
★★★★★
4.9 from happy Sydney customers
Request your free quote

No obligation, free site quote.

Licensed operators
Dial Before You Dig
Fully insured work
Local Sydney crew
Rock
Digs handled
Mini to 35t
Machine range
4.9★
Average rating
Free
Site quotes
Get the fall right

A trench dug wrong drains the wrong way

Water only goes where the fall takes it. A trench that's a few millimetres out over its run holds water in the pipe, and a trench backfilled loose settles into a dip in the driveway a year later. Then there's what's already in the ground: every Sydney block has services running somewhere, and a trench is the easiest way to hit one. The job is set out to the plumber's or engineer's levels, the services are located and hand-exposed where they cross, and the backfill goes in compacted in layers so the surface stays where it was left.

Dug to the plumber's line and level
Services located and hand-exposed at crossings
Bedded and backfilled in compacted layers
Surface reinstated, no dip six months on
At a glance

The trenching job, in short

Machine range
1 to 8t
Minis for narrow runs, midis for long or deep trenches
Typical jobs
Stormwater to sewer
Service, drainage, ag and subsoil lines
Width
300 to 600mm typical
Bucket sized to the pipe and the bedding
Fall
Set with laser
To the plumber's or engineer's levels
Services
Located and exposed
Dial Before You Dig, then hand-dug at crossings
Bedding
Sand or aggregate
Laid ready for the pipe
Backfill
Compacted in layers
No settlement under paths and driveways
Ground
Clay, sandstone, fill
Rock trenches cut with saw or breaker
What's included

What trenching and drainage covers

Service trenches
Power, water, gas, comms and sewer runs dug to the depth and width the trade needs.
Stormwater drainage
Lines from downpipes and pits out to the street or an absorption system, dug to fall.
Subsoil and ag drains
Trenches behind retaining walls and along wet areas, dug and bedded for slotted pipe.
Bedding and backfill
Sand or aggregate bed laid, then backfilled and compacted in layers after the pipe's in.
Rock trenching
Sandstone and shale cut with a saw or broken out where the bucket won't go.
Reinstatement
Surface levelled and left ready for turf, paving or concrete.
Where it suits

Every line we dig

From a single downpipe run to the services for a whole development, the trench is sized to the pipe and the ground.

New builds

New builds

Service and stormwater trenches dug ahead of the plumber and electrician.

Stormwater

Stormwater to the street

Lines run from the house to the kerb or council pit, dug to fall.

Wall drainage

Retaining wall drainage

Ag drains and gravel backfill behind new walls so they don't hold water.

Rural runs

Long rural and acreage runs

Water, power and drainage trenched over distance to sheds and house sites.

Civil

Commercial and civil sites

Deeper and wider trenches for stormwater, sewer and site services.

Tight access

Tight access and side passages

Narrow runs where a standard machine can't fit.

Sandstone, clay, tight access

Trenching built for Sydney ground

A trench through Sydney ground rarely stays in one material. On the North Shore, the Northern Beaches and around the harbour, sandstone sits close to the surface and a trench that starts in soil hits rock within the first metre, which means a rock saw or breaker rather than a bigger bucket. In the west and south-west, reactive clay holds water, so drainage trenches need proper aggregate bedding and subsoil lines or the water just sits. Older suburbs have services in odd places and old clay sewer lines that don't show on any plan. The run is scoped for the ground it actually crosses, and the services are found before the bucket goes in.

SandstoneShaleReactive clayOld servicesTight access
How it runs

First call to clean handover

Every job follows the same sequence, whether it's a single trench or a full site cut.

Services located 01

Assess & quote

Site visit, plan review and Dial Before You Dig. One clear quote covering dig, cartage and cleanup.

Access protected 02

Set out & protect

Levels marked, driveway and surfaces protected, machine sized to the site.

Spoil carted 03

Dig & cart

Dug to plan and level, spoil carted as we go so the site keeps moving.

To level 04

Trim & hand over

Site trimmed, tidy and to level, ready for the next trade.

A trench can be a day, a basement can be weeks. Dates come with the quote, not after.

What size suits your job

Right machine for your access

Excavators are sized in tonnes, and the size decides both what it can dig and whether it fits your block. We bring the one that suits the job, not whatever's parked up.

Most trenching
Mini1 to 6t

Backyards, pools, trenches and tight access, some fit through a standard side gate.

Midi6 to 10t

Larger residential, driveways and small site cuts where a mini runs out of reach.

Standard10 to 20t

Full site cuts, basements and bulk residential or commercial digs.

Large20 to 35t+

Bulk earthworks, civil and big commercial jobs moving serious volume.

Not sure what'll fit? Access usually decides it, tell us the site and we'll match the machine.
The job explained

What a good trench actually looks like

A drainage or service trench starts with two things: the levels and the services. The plumber or engineer sets the invert levels, the depth the pipe has to sit at each end, and the fall between them. Dial Before You Dig comes back with what's already in the ground. Where the new trench crosses an existing service, that spot is hand-dug first so the bucket never meets it.

The trench is then set out with pegs and string and cut with a bucket sized to the pipe. Too narrow and the plumber can't work in it; too wide and there's more backfill to compact and more surface to reinstate. Depth is checked with a laser as the machine works along the run, because a trench that's right at both ends but sags in the middle still holds water.

Sydney ground changes what happens next. In clay the walls stand clean and the trench is straightforward. In sandstone the bucket stops and a saw or breaker takes over, which is slower but leaves a straight trench rather than a broken one. Fill and old rubble mean loose walls and a wider trench than planned.

Bedding goes in before the pipe: sand or fine aggregate laid and levelled so the pipe sits evenly along its whole length rather than resting on high points. Once the pipe is in and tested, the backfill goes back in layers, each one compacted, with the right material around the pipe first. This is the step that decides whether the driveway or path above sinks in a year.

The surface is then reinstated, levelled and left ready for turf, paving or concrete. A good trench is one nobody can find a year later, because nothing has moved.

Mini excavator backfilling a trench in compacted layers
Recent work

Sites we've dug

Backyards to building sites, right across Sydney.
Penrith Site cut
Castle Hill Pool dig
Ryde Basement
Liverpool Civil
“Very easy to deal with.
Excellent communication”
Priya, Penrith
“Left the site spotless.” Dave, Castle Hill
“Would definitely recommend them!” Marcus, Ryde
“Great job thanks so much.” Lauren, Liverpool
“Very easy to deal with. Excellent communication” Priya, Penrith “Left the site spotless.” Dave, Castle Hill “Would definitely recommend them!” Marcus, Ryde “Great job thanks so much.” Lauren, Liverpool
“Very easy to deal with. Excellent communication” Priya, Penrith “Left the site spotless.” Dave, Castle Hill “Would definitely recommend them!” Marcus, Ryde “Great job thanks so much.” Lauren, Liverpool

Trenching and drainage questions, answered

How much does trenching cost in Sydney?

It depends on the length and depth of the run, the ground (clay is quick, sandstone isn’t), access for the machine and whether bedding and backfill are included. Every job gets a written quote after a site look, with dig, materials and reinstatement spelled out.

Do you lay the pipe as well?

We dig, bed, backfill and reinstate. The pipe is laid by your plumber or drainer, and we work to their levels. On many jobs we’re on site the same day so the trench is open for as short a time as possible.

How do you avoid hitting existing services?

Dial Before You Dig on every job, then hand-exposure wherever the new trench crosses a known service. Where plans are unreliable, which is common on older Sydney blocks, we pothole to confirm before the machine digs.

Can you trench through rock?

Yes. Sandstone and shale are cut with a rock saw or broken out with a breaker. It’s slower than digging clay and is priced separately in the quote once we’ve seen the site.

Will the trench sink later?

Not if it’s backfilled properly. Backfill goes in layers and each layer is compacted, so the surface above stays level. Loose backfill is the reason trenches show up as dips in driveways.

Can you dig a trench down a narrow side passage?

Yes. Mini excavators fit through most side gates and some retract narrower for tight passages. Spoil is handled on boards or wheeled out so the passage isn’t wrecked.

Do I need council approval for stormwater to the street?

Connecting to a council kerb or pit usually needs a permit from the council, and your plumber or certifier normally arranges it. We dig to the approved plan.

Other services

Excavation for every stage

Clearing

Land Clearing

Vegetation, stumps and debris cleared to a workable site.

Earthmoving

Earthworks & Earthmoving

Bulk earthmoving, cut and fill, site cuts and levelling for residential and commercial builds.

Rock

Rock Excavation

Sandstone and hard rock removed by saw, breaker or attachment.

Pools

Pool Excavation

Precise pool digs shaped to plan, tight access included.

Basements

Basement Excavation

Deep digs with battering, shoring and spoil handled.

Tight access

Mini Excavation

Compact machines for narrow access and small jobs.

Demolition

Demolition & Excavation

Demolition, clearing then excavation as one job.

Get started

Not sure what you need?

Tell us about the job and we'll point you the right way.

Get a free quote
What happens next

Tell us the job. We'll size it up.

Tell us the suburb, the access and what needs digging
We'll come out and look before quoting anything
You'll get a written quote with what's included spelled out
The machine's matched to your access, not whatever's free
Clear on spoil, cartage and cleanup before we start
No obligation, no pressure
Get a free quote
Excavator arm breaking rock on a Sydney site
Where we work

Excavation right across Sydney

From Liverpool and Macarthur out west, up through the Hills and the North Shore, across the Inner West and the Eastern Suburbs, over to the Northern Beaches and down to the Sutherland Shire. If you're anywhere in Sydney, we can get to you.

Check we cover your suburb →
Parramatta Penrith Blacktown Liverpool Castle Hill Ryde Chatswood Cronulla Campbelltown Bankstown Manly Baulkham Hills
Parramatta Penrith Blacktown Liverpool Castle Hill Ryde Chatswood Cronulla Campbelltown Bankstown Manly Baulkham Hills
Free quote

Ready to get your dig underway?

Tell us about the job. We'll look at the site before quoting, so you know what's included before anything starts.

Written quote after a proper site look
Free quote after a proper site assessment
Request your quote
No obligation, free site quote