Assess & quote
Site visit, plan review and Dial Before You Dig. One clear quote covering dig, cartage and cleanup.
Sydenham is a low industrial-and-cottage pocket on Cooks River flats, drainage-heavy site-cut work near the airport. The regular jobs here are basement digs, site cuts and drainage. Services located first, sites left level and clean.
Get a free quoteNo obligation, free site quote.
Got it, thanks. We'll be in touch to arrange your site assessment and clear quote.
From a knock-down rebuild to a new estate pad, each service has its own page with the detail.
Sydenham sits about 7 kilometres west of the city. It's anchored by Sydenham station, Sydenham Green, Cooks River and airport flight path. It's ringed by Marrickville, St Peters and Tempe. What's changing: apartment and townhouse sites, and basements and drainage working around the water table.
Most blocks in Sydenham, around Sydenham station, are federation cottages and warehouses giving way to apartments and townhouses. Near Sydenham station, the heritage streets carry conditions near the listed houses. On a Sydenham block that usually means basement digs, site cuts and drainage.
Sydenham ground runs to river alluvium and reclaimed flats over shale near the Cooks and Parramatta rivers, over by Sydenham station. Old fill on the Sydenham lots near Sydenham Green is checked and either carted off or re-rolled to the engineer's spec before a slab. Around St Peters, the fall is built into the pad and the trenches, and fill goes in compacted.
Around Sydenham station, Sydenham carries contamination controls in Inner West Council, dug to the approved plans. Into Sydenham the crew comes off Sydenham Road or Railway Road; access is tight through the older inner streets.
Every job follows the same sequence, whether it's a single trench or a full site cut.
A trench can be a day, a basement can be weeks. Dates come with the quote, not after.
Sydenham and the streets around it, from the older estates to the new blocks.
From the older streets to the newer blocks, Sydenham and the suburbs around it. If you're anywhere in the Sydenham area, we can get to you.
See the whole Inner West →It depends on the volume of material, the ground (river alluvium and reclaimed flats over shale near the cooks and parramatta rivers), access for the machine and how far spoil has to be carted. Every job gets a written quote after a site look, with the dig, cartage and cleanup spelled out, so you know what’s included before anything starts.
Usually, if the excavation is part of a build. Cut and fill beyond set limits, work near boundaries and anything on a lot with a flood, bushfire or heritage overlay needs approval as part of the DA or CDC. We work to the approved plans; check with your certifier before the dig is booked.
A trench, pool dig or single pad is a day or two; a knock-down site cut or a basement runs longer and depends on volume, ground and weather. Dates come with the quote, not after.
Not usually in the first metre on the flat streets. River alluvium and reclaimed flats over shale near the Cooks and Parramatta rivers. Shale under clay is ripped rather than broken, and old fill is the more common surprise than rock.
Yes, and it’s one of the most common Inner West jobs. The house is supported to the engineer’s underpinning design, the ground under it is dug in stages through the front or rear, and rock is sawn at the party walls so the neighbours’ footings stay put. Spoil goes out by conveyor.
Through the house on boards with the floor protected, or over the back fence by crane. Spoil comes out the same way or by conveyor into a skip in the lane. Slower than a side gate and priced for it, but it’s how most Inner West yards get dug.
Conditions on the approval, usually about keeping the front of the house, protecting the neighbours’ walls, and sometimes an archaeologist watching the dig on the oldest streets. Haberfield and the older parts of Balmain, Glebe and Marrickville are the strictest. We dig to what’s approved.
Along the rivers, Parramatta Road and the old industrial land, possibly. A century of fill is common and some of it carries lead, ash and asbestos. Council maps flag it, spoil is classified and managed to a plan, and the site look prices the handling honestly.
Tell us about the job. We'll look at the site before quoting, so you know what's included before anything starts.
Request received. We'll be in touch to arrange your site assessment and clear quote.