Assess & quote
Site visit, plan review and Dial Before You Dig. One clear quote covering dig, cartage and cleanup.
North Rocks is 60s–80s brick veneer on rolling, leafy ground between the Hills and Parramatta, pool and retaining territory. The regular jobs here are pool digs, granny flat and shed pads and retaining walls. Services located first, sites left level and clean.
Get a free quoteNo obligation, free site quote.
Got it, thanks. We'll be in touch to arrange your site assessment and clear quote.
From a knock-down rebuild to a new estate pad, each service has its own page with the detail.
North Rocks sits about 26 kilometres north-west of the city. The markers are North Rocks Shopping Centre, Muirfield Golf, Darling Mills Creek and Bidjigal Reserve. It's ringed by Carlingford, North Parramatta, Baulkham Hills, Northmead and West Pennant Hills. What's changing: pools, granny flats, duplexes and knock-down rebuilds.
North Rocks' housing near North Rocks Shopping Centre runs to 1960s–80s brick veneer on rolling, leafy blocks. Near North Rocks Shopping Centre, knock-down rebuilds are the running theme. Day to day around Carlingford that's pool digs, granny flat and shed pads and retaining walls.
Out toward North Rocks Shopping Centre, North Rocks sits on Shale over clay on rolling ground with sandstone in the creek gullies. Around Muirfield Golf a North Rocks dig hits sandstone in the first metre, sawn at the edges so the neighbour's ground stays put and broken in the middle. Around North Parramatta, the clay is reactive, so fill goes in in compacted layers.
In City of Parramatta (some streets The Hills Shire Council), North Rocks near North Rocks Shopping Centre carries no overlay, so the cut and fill runs under the DA or CDC. Access to North Rocks is off North Rocks Road or Pennant Hills Road; there's a side gate wide enough for a mini, near Carlingford.
Every job follows the same sequence, whether it's a single trench or a full site cut.
A trench can be a day, a basement can be weeks. Dates come with the quote, not after.
North Rocks and the streets around it, from the older estates to the new blocks.
From the older streets to the newer blocks, North Rocks and the suburbs around it. If you're anywhere in the North Rocks area, we can get to you.
See the whole Hills →It depends on the volume of material, the ground (shale over clay on rolling ground with sandstone in the creek gullies), access for the machine and how far spoil has to be carted. Every job gets a written quote after a site look, with the dig, cartage and cleanup spelled out, so you know what’s included before anything starts.
Usually, if the excavation is part of a build. Cut and fill beyond set limits, work near boundaries and anything on a lot with a flood, bushfire or heritage overlay needs approval as part of the DA or CDC. We work to the approved plans; check with your certifier before the dig is booked.
A trench, pool dig or single pad is a day or two; a knock-down site cut or a basement runs longer and depends on volume, ground and weather. Dates come with the quote, not after.
Yes. Shale over clay on rolling ground with sandstone in the creek gullies. North of Glenhaven and down in the gullies, sandstone is usually within the first metre, ripped where it’s weathered and broken where it’s solid. It’s in the quote when the site look finds it.
The block is benched: cut into two or three levels to the engineer’s plan, with retaining walls where the levels meet, so the new house sits on a flat pad instead of on fill. Cut and fill on slopes is regulated, so it goes through the approval with the retaining design.
Yes, and it’s the standard Hills pool. The shell sits on a bench cut into the hillside, with a cut for the retaining wall on the uphill side and the downhill side formed. The pool builder’s engineer decides the bench, and the site look decides the machine.
Reactive clay. It swells in wet winters and shrinks in dry summers, and anything poured on loose or uncompacted fill moves with it. A pad cut and filled in compacted layers to the engineer’s spec is what stops the new slab doing the same thing.
Yes. The old house down, slab and footings out, the block stripped and the new pad cut and compacted, as one run if you want the demolition handled too.
Tell us about the job. We'll look at the site before quoting, so you know what's included before anything starts.
Request received. We'll be in touch to arrange your site assessment and clear quote.